Solar
    Solar
    Wind
    Wind
    Electrolyzer
    Electrolyzer
    H₂ storage
    H₂ storage
    Compressor
    Compressor
    digHy design

    Advance your project with expert certainty

    The problem

    The complexity of the P2X sector cannot be modeled in spreadsheets

    Using simple tools or tools that do not represent the operation of these plants implies losses of millions of euros in the long term.

    Amateur modeling

    The use of spreadsheets or models that are not representative reduces the credibility and competitiveness of the projects under analysis.

    Outdated data

    The variability of the sector makes it difficult to keep costs, specifications, regulations up to date...

    RED III Regulation

    Correct project modeling will only be good if it is accompanied by an analysis of compliance with the RED III conditions and Delegated Acts.

    What you gain with digHy design

    More speed, less cost, and projects that convince third parties.

    Scenario simulation in minutes

    Configure key parameters of your hydrogen plant and observe the impact immediately.

    Optimal sizing

    Find the best ratio between renewable power, electrolyzer, and storage.

    Detailed financial analysis

    Calculate LCOH, CAPEX, and OPEX with permanently updated market data.

    Automatic Documents

    Get reports, plans, PFDs and other technical information with just one click.

    Without hiring anyone

    The depth of an engineering firm, in your hands

    Configure each parameter.

    Predefined values ​​based on experience and real projects
    Advanced plant optimization methods
    Hour-by-hour modeling throughout the plant's life
    Analyze each type of system in detail
    Electrolyzers
    Electrolyzers
    Compressors
    Compressors
    H2 Storage
    H2 Storage
    Synthetic Plants
    Synthetic Plants
    GeoTool

    Invest only where the project is profitable

    Locate your plant and identify nearby infrastructure and site suitability. Use our unique LCOH layer to find the best locations.

    Evaluate the hourly solar and wind resource of the exact plant location
    Study the capacity of nearby substations
    Find out if there is water available in the surrounding area
    Identify constructive feasibility through elevation and topography models
    LCOH Map · Spain
    GeoTool
    2,98 €/kg
    3,41 €/kg
    Higher cost
    Lower LCOH
    Automatic documentation

    All project documentation, generated automatically

    Export documentation in a standardized way.

    Process Flow Diagrams (PFD)
    Hourly mass and energy balances
    Profitability study and cash flows
    Descriptive report of the P2X project
    Generated documentation
    Andévalo Project · 50 MW
    Technical-economic reportPDF
    Process flow diagram (PFD)DWG
    Sizing memoryPDF
    Simulation dataXLSX
    Electrical substation connectionPDF
    Water catchment requestPDF

    Ready to get started?

    Try digHy Design and reduce your engineering time.